Jan 20, 2025

2014 to 2025

 In 2014 we had a new pool built by Acacia Pools here in Tauranga. 10 years on it was time to re-tile.

The basic pool structure was still in in amazing condition. The re-tile job was done by PC Tiling. What a mission! Such a laborious job in very hot weather and also rain! The team from PC were amazing. They worked from 7 am to 5.30 pm each day with minimal down time. We are so please with the result.

The original pool in 2014

The re-tiled and re-waterproofed in 2025
Various stages on the job








No comments:

Post a Comment